Tuesday, September 17, 2013

Monday, September 9...

The north side of the church building braced up.

South side (entrance) wall framed up and braced.

Excavating on the south east side of the property.  Rather than run off septic and well, we are connecting  into the Town of Silt's supply for sewer and water.

We have had soooo much rain of late! Makes for a muddy mess.

The trench for water and sewer.

Not exactly sure what these are for.  Thought it cute to see our church name posted on them. :-)

Pipes that will be used for the water main.



Another view of the South (entrance) side.

Trusses waiting for their spot in the future roof.
West side wall.


The north wall.

The finished stairway down into the mechanical room.

Busy figuring...

Waiting for steel.


View out the south side looking southwest.

Now who happened upon the construction site? 



This makes my (wife of a plumber) heart sigh... :-) ha, jk.

Figuring out a supply list for some plumbing that needs to be done.

No comments:

Post a Comment