![]() |
The north side of the church building braced up. |
![]() |
South side (entrance) wall framed up and braced. |
![]() |
Excavating on the south east side of the property. Rather than run off septic and well, we are connecting into the Town of Silt's supply for sewer and water. |
![]() |
We have had soooo much rain of late! Makes for a muddy mess. |
![]() |
The trench for water and sewer. |
![]() |
Not exactly sure what these are for. Thought it cute to see our church name posted on them. :-) |
![]() |
Pipes that will be used for the water main. |
![]() |
Another view of the South (entrance) side. |
![]() |
Trusses waiting for their spot in the future roof. |
![]() |
West side wall. |
![]() |
The north wall. |
![]() |
The finished stairway down into the mechanical room. |
![]() |
Busy figuring... |
![]() |
Waiting for steel. |
![]() |
View out the south side looking southwest. |
![]() |
Now who happened upon the construction site? |
![]() |
![]() |
This makes my (wife of a plumber) heart sigh... :-) ha, jk. |
![]() |
Figuring out a supply list for some plumbing that needs to be done. |
No comments:
Post a Comment