|  | 
| The north side of the church building braced up. | 
|  | 
| South side (entrance) wall framed up and braced. | 
|  | 
| Excavating on the south east side of the property. Rather than run off septic and well, we are connecting into the Town of Silt's supply for sewer and water. | 
|  | 
| We have had soooo much rain of late! Makes for a muddy mess. | 
|  | 
| The trench for water and sewer. | 
|  | 
| Not exactly sure what these are for. Thought it cute to see our church name posted on them. :-) | 
|  | 
| Pipes that will be used for the water main. | 
|  | 
| Another view of the South (entrance) side. | 
|  | 
| Trusses waiting for their spot in the future roof. | 
|  | 
| West side wall. | 
|  | 
| The north wall. | 
|  | 
| The finished stairway down into the mechanical room. | 
|  | 
| Busy figuring... | 
|  | 
| Waiting for steel. | 
|  | 
| View out the south side looking southwest. | 
|  | 
| Now who happened upon the construction site? | 
|  | 
|  | 
| This makes my (wife of a plumber) heart sigh... :-) ha, jk. | 
|  | 
| Figuring out a supply list for some plumbing that needs to be done. | 



 
No comments:
Post a Comment